Wednesday, May 5, 2021

Synthetic Rope Repair

 

Thank you for purchasing the synthetic rope repair kit!  Below are a few videos that are a great reference for repairing damaged synthetic rope or even creating a length of rope with an eye on each end.  They are not my YouTube videos.  These methods can be done in the field if you have everything necessary.  I recommend adding them all to the canvas bag to keep everything together. 

You will need:

  • ·         A Sharpie or similar marker
  • ·         Scissors or a sharp knife
  • ·         Electrical tape or similar
  • ·         FID, needle, and whipping twine
  • ·         Optional:  Tube Thimble

o   For 3/8  - https://www.amazon.com/Stainless-Thimble-Synthetic-Ultranger-Diameter/dp/B06XT5KDS2

o   For 5/16, 1/4, 3/16 - https://www.amazon.com/Ranger-Stainless-Steel-Thimble-Synthetic/dp/B06XSVLS9W

Dyneema Eye Splice Demonstration:  https://www.youtube.com/watch?v=VDQ28yUs7AA

Dyneema Lock Stitch Demonstration:  https://www.youtube.com/watch?v=tKqAfBfNc3A

Link to my 5/16 synthetic rope repair kit: 
https://poconos.craigslist.org/for/d/saylorsburg-synthetic-rope-repair-kit-16/7317715663.html

Link to my 3/8 synthetic rope repair kit:  https://poconos.craigslist.org/for/d/saylorsburg-synthetic-rope-repair-kit-8/7317717720.html

Eye Splice Procedure

Measure one fid length from the end.  This will become the taper.  Mark a line with a sharpie. 

Measure another two fid lengths from that mark and make another mark (but two lines this time).  This will be the end of the tail.

Mark two is also the beginning point of the eye.

A 50% reduction of a 12-strand rope means we need to remove 6 of the strands.

Mark a V, skip one, mark next V, then skip one, Mark the last V.  These three marks will be for 6 strands.  The skipping allows the rope to slope or gradually step down.

Once you have your marks, start with the strand closest to the end.  use the hollow end of the fit to lift up the marked strand.  You will see where the strand is 'indented' from the braid.  That is where you want to make the cut.

Make the cut, then move to the next strand until all 6 marks are cut.  Pull out the length of the strands that were cut. 

Once you have all six out, they can be discarded.

Unbraid the last 2 inches, then cut a gentle taper to the end of the rope.

Take some electrical tape and tape the end of the rope.  this should bring it to a point.  No more than two wraps. 

Insert the point of the tape into the end of the fid and tape it there.

Measure 4 fid lengths from the double mark.  Then mark the entire diameter of the rope, all the way around.

The "Bury" is about one V above the double mark. Take the rope and birdcage it so you can work the fid into the core of the rope.

This works just like a Chinese finger toy.  Keep working the fid through the core of the rope.  Make sure the fid stays in the center and the point doesn’t catch any strands.

As you birdcage, you'll feel the fid keep moving through the core of the rope.  Then hold the front of the fid and pull the rope towards the back.  This will keep moving it through.

When you get to the exit point, bring the fid out. 

Now double check the eye - make sure its tight and work the rope to get it where you want it.

Remove the fid from the tail, and remove the tape from the tail.  Make sure all the tape is removed - this is important.

Hold the eye and milk the birdcage all the way down the rope.  You'll see the tail get sucked up inside. 

Do this a few times.  You should notice a good taper going down the rope.

Lock Stitch

to prevent the bury from moving out of the center of the rope, you'll need a lock stitch. 

take a little bit more than an arm's lengh of thread.

keep a few inches of the end of the thread free

Use a figure 8 stopper knot.  Make a loop, then twist the loop once, then take the end and put it through the loop.  Pull softly to make the knot.  Dont pull too tight as you want it to have some bulk to it.

Take the other end and thread the needle.  Pull about five inches through.

The first pass through should be one to 2 strands down from the bury.  As you pass the needle through, bunch up the rope so that the knot doesnt pull through.

The goal is to make three passes through the rope, skipping one strand every pass.  Then rotate the rope 90 degrees and make another three passes the same way heading back towards the eye.  Again, each pass will skip one strand.

Once that is done, you can remove the needle.

Take the tail of the thread after the knot and make a loop down the length of the rope, and have the tail towards the top of the eye of the rope.  This will help in chinching up the loose end after we wrap the rope with the thread.

Take the length of thread and wrap the rope, keeping it tight.  You need to make at least 8 passes minimum.  More if you like. 

Keep each pass tight against the previous, making sure they do not overlap.  Once you are done with that, pass the end of the thread through the loop.

Now you are going to pull the thread by the eye (the other end of the loop) until you pull the loose end under the wrapping. 

You will see the bunch going under the wrapping.  Once it is about half way, grab both ends of the thread and pull it tight, lockign it in.

Trim the ends and that is it!

 

 

Thursday, April 1, 2021

2003 Mustang Cobra Convertible

2003 Mustang Cobra Convertible

Basics

Paint is Redfire

Interior is charcoal gray

Touch screen pioneer stereo

Car has 33k miles on it and will continue to be driven. I’m the second owner and have put 9k miles on it so far.

Engine and Transmission

Metco pullies and idlers, billetflow SC pulley

Cold air intake and Accufab throttle body

NGK TR6 plugs

Cobra Engineering head cooling mod

T56 with steeda tri-ax shifter and fresh fluid each year

Motorcraft synthetic blend oil and motorcraft filter every year.

SCT chip, drives perfectly

Exhaust

Bassani mid pipe with cats

Magnaflow polished cat back - no drone

Suspension

Bilstein shocks and struts

Eibach pro-kit vert specific springs, energy suspension isolators

Maximum Motorsports caster camber plates

Brakes

Russel stainless steel braided lines

Motul 600 fluid

Russel speed bleeders in each caliper

Hawk HPS pads front and back

Baer Eradispeed plus two piece rotors

Wheels and tires

Rovos Pretorias staggered. Front is 9 inch, rear is 10.5

Nitto NT555 G2 tires front and back.

Tuesday, March 2, 2021

Front Shelf for my Req-Tec Stampede RT-590!

 I have had my Stampede (Req Teq RT-590) for almost a year now.  You can buy a folding front shelf off the Req Teq website.  It costs about $100.  The only downside is that there have been reports that the brackets interfere with the cover.  Those not using a cover don't have to worry about this.  I ordered and use the Req Teq cover.  For the record, the cover is awesome and fits the grill perfectly.

 I fooled around with some designs for a front shelf.  I could get a custom stainless steel shelf, without the brackets for 120$.  That price drops significantly if we do a group buy.  For example, a count of 20 would only be 65$ each.  The shelf would be 11GA brushed stainless, bends on the front and sides, and with the word STAMPEDE cut out towards the top.  To do this correctly I would need to:  1.  Buy the one for 120 to show it off.  2.  Get 20 people to pay up front  3.  Then put in the order, which will take some time to complete.  I'm not sure if that is likely.  You can leave a comment if you're interested!  Maybe this goes viral and we get 100 people that want the custom Stampede front shelf!

On to the work!  

I already had the brackets.  To install the bracket, I needed to enlarge the middle mounting holes.  Then I used the existing grill bolt to mount the bracket.  A small hole was drilled and a sheet metal screw was used for the lower hole.   This mounted the folding brackets to the grill.  

 Here is the link to the folding brackets:  https://www.amazon.com/gp/product/B01M2UYPHS 

I decided to go with a black cutting board.   This particular one is 30x18x0.5 inches and is NSF rated for commercial food service.  When it arrived I laid it on the brackets and took some measurements to center it and keep it slightly away from the grill body.  Then I found some self tapping screws and washers (only need 4) that were less than 1/2 inch long.  I should have drilled pilot holes - the board was a bit tougher than I expected - but I was able to make due.  With the board centered, I drove the screws home and luckily they did not penetrate the top of the board.  

 Here is the link to the cutting board:  https://www.amazon.com/gp/product/B083F7VX2T

 Here is what it looks like when it's done!





Tuesday, October 27, 2020

Engine Swap - Dart SHP based stroker!

The last time I wrote about this motor, there was still a long way to go.  Since then, a good count of parts needed to be changed.  I'll also update the progress after I got the motor home and on the stand.  I'm planning to do the engine swap this off season.  Hoping to get it done before April 2020!

I'll start off with the Probe crank - it was balanced and ready for assembly when inspection showed the thrust was way out of spec.  Basically the crank was unusable.  So we had to trash it.  The replacement is a Scat forged crank.  I'm not upset about this.

The pistons are still CP Billet forged, with Liberty rods. The bore is actually 4.155 and stroke is 3.25 making the displacement 352ci.  So its not a 347! 

Oil pan - the pan I had didn't fit the dart block and had to go with one that did.  Needed a pick up tube also.  The pan has two bungs welded in for oil return - one on each side - just in case.

The AFR 185 heads have been worked over, significantly.  They are now 210's, with bigger intake valves and brand new exhaust valves, new springs, new retainers - basically everything replaced.  The LGM shaft mount rockers are on, but didn't clear my valve covers (at first, more on that later). Needed a 12pt head stud to clear the shaft mount rails.  Head gaskets are MLS by Fel Pro. 

Cam is unchanged - FTI custom grind.  

Still have the Romac balancer and RAM billet steel flywheel.

The Trick Flow R intake lower has been port matched to the heads.


The Dyno session couldn't use my Trick Flow R intake since that is EFI.  What they had on hand was a cheap dual plane intake and a 600 carb, which definitely hurt the numbers.  The motor did make 465 HP and 440 TQ.  Not bad for being restricted.  We were shooting for 500HP and with a good intake and fuel delivery, that would have easily been achieved.

Extra:  

The motor has been home and on the engine stand for some time now.  I've sourced the alternator and power steering brackets, power steering pulley and a new power steering pump.  I've had the pulleys and brackets powder coated wrinkle black and they are mounted to the engine using the stock hardware.  The pulleys have ARP hardware, including the crank, water pump, and thermostat housing.  

I've installed Team Z 3/4 inch drop solid motor mounts.  This took some massaging on the block and mounts, but turned out awesome.  I ordered ARP bolts for the mounts too.

I had to do some grinding on the inside of the trick flow valve covers to make them fit with the shaft mount rockers.  Both valve covers were hitting the rocker stand.  Using a micrometer, I measured the thickness of where the interference was on the valve cover.  I used a die grinder with the sanding disk to clearance a little at a time.  Eventually the valve covers fit, and I only removed a couple thousandths of an inch from the covers.  I'm really excited that the valve covers fit!  They offer a ton of clearance with the R intake and look good too.  I have a stainless steel stud kit I made for the covers as well using stainless set screws and shouldered stainless nuts.  

Speaking of the heads, I also have a set of stainless header set screws, ARP 12 point stainless nuts and washers.  The headers will be BBK long tubes with 1 3/4 primaries.  I cut the ball flanges off, which will be modified for a V band clamp and custom mid pipe.  Mufflers are Gibson BM0105, and I'm deciding to go with Pypes or Flowmaster 3 inch tailpipes.  The whole exhaust will be 3 inch.  

I'll put up another post about the K member and steering rack, which is going to be a significant upgrade!




Saturday, October 17, 2020

1994 Cobra Suspension Upgrade

 I'm falling behind on the updates.  There's been a few upgrades since the last post.  Full suspension, subs and amp, and even the body work.  This post will cover the suspension upgrade. 

I'll start with the rear suspension, which included swapping the 8.8 rear.  It only has 74k miles on it, so the bolts were not seized.  With the car on the lift and supported in the front by jack stands / jack tray, and the rear supported by the bridge jack, I removed all the wheels, calipers and rotors.  Next was the lower control arms.  These had to be lowered easily using some scissor jacks supported on the lift.  That allowed for removing the springs and isolators. Then the shocks, quad shocks, upper control arms, and the brake lines, and ABS sensors. I realized when removing the rear calipers that the boots were ripped and the calipers were actually different colors.  This will get addressed in a separate post. 

I was able to swap the caliper mounting plates to the new rear, which only required pulling the axles out of each rear to install them.  

Some info on the 'new' rear:  Straightened, welded and powder coated.  Strange 31 spline axles, Torsen differential with 3.55 gears, ARP studs on the carrier caps, GT500 finned differential cover and lubelocker gasket, ARP 3 inch wheel studs, new pinion flange, new timken bearings and seals.  The 8.8 housing bushings were removed and replaced with spherical ARP bushings.  

Luckily I had a bunch of help putting the rear back in the car.  It was installed along with Tokico D spec shocks, Eibach Pro-Kit springs, energy suspension isolators, UPR Double adjustable upper control arms with the urethane bushing on the chassis side, and maximum motorsport weight jacker lower control arms with spherical on the 8.8 housing side and urethane on the chassis side.  I'm simplifying here - this install took a few hours!  

On to the front suspension.  I removed the front sway bar end links and sway bar bushings and removed the sway bar.  Then supported the lower control arm with scissor jacks and removed the strut from the spindle, then pulled the strut from the car.  I lowered the lower control arm down and eventually removed the sprint and isolators.  Then had to pull the tie rods from the spindle.  I removed the nut, used a puller to put pressure on the top of the tie rod, then whacked the spindle with a hammer and it popped right out.  I did the same for the ball joints.  It was at this point that I needed new ball joints on both sides.  next I removed the control arm to chassis bolts and pulled the control arms.  Repeat process for the other side.

I removed the caster camber plates too, as these were getting upgraded as well.  We took measurements to try and get close when re-installing.  

The Maximum Motorsports caster camber plate installation requires drilling of a 4th hole.  The instructions make it easy!  The front lower control arms were ordered from LMR and are OEM stock replacements.  When the engine swap is done, the front suspension will get racecraft k member and control arms.  So these were temporary.  Tokico D Spec struts were installed up front, along with the Eibach Pro Kit springs and energy suspension isolators.  The installation was pretty straight forward, and having the car on the four post lift with it raised up in the air helped a LOT.  

Finally adjusted the shocks and struts to the starting point recommended by Tokico.  I found this to be a little stiff, but I'm still getting used to how the car handles with the new suspension.  It feels great, handles well, and since I had some help adjusting pinion angle and centering the rear under the car, it hooks from a dig.  I'm really happy with the way it turned out!